Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T17RW03177
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | work completed - close permit | |
| 03/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with matt and showed him some items that KE&G seems to be having an issue in replacing that were damaged in the sewer bypass job - CN | |
| 03/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out and looked at the stuff they are replacing that were out of spec. there was 2 areas that al said he would have to get with his bosses to approve for replacement. i talked with matt and he said that we would go out on monday and look at those areas - CN | |
| 02/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | work along 36th looks good, but ramps and sidewalk and patching along euclid from 39th to 33rd not in spec per ada. I infromed matt he said that he would write and NOV. CN | |
| 02/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | matt asked me to go back out and document all locations that are out of spec so that he can note them on the NOV - CN | |
| 01/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with matt and pete to look at the area's pima county doesnt want to replace - CN | |
| 01/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with al and went over the damaged areas from the sewer bypass that needed to be replaced. we also talked about how the whole ramp needs to be replaced due to damage and not meeting current ada requirements. CN | |
| 12/18/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with al and looked over the NW and SE corners that he had laid out for ramps to be poured tomorrow - CN | |
| 12/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | pete and i stopped by and meet with al, pete said he was okay with al pouring the ramp landing first and then the wings of the ramp , al understood that it all needed to be poured ada - CN | |
| 12/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | stopped by and talked with al about the areas they will be pouring back at the intersection of 36th and euclid that got damaged. i let him know that they needed to be poured back to ada spec he then told me that he was instructed to put them back as they were originally. I will bring pete out to the job - CN | |
| 12/07/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control looked good, they poured a curb/ramp opening on the NW corner of euclid and 36th, then opening was over 2% cross slope. Icalled and informed cody that it would need to be fixed. CN | |
| 10/30/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | full closure at euclid and 36th for install - CN | |
| 10/10/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | called and asked cody to install orange fence at bypass dip locations and also reminded him to renew the permit - CN | |
| 09/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - no work going on - CN | |
| 07/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | started on the sewer bypass along euclid/talked with nick from ke&g |