Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 9/2/17 Two ramps were poured per plans 9/5/17 Sidewalks poured 6/6/17 sidewalks stripped and area was cleaned up. Deviated from the plans and moved sidewalk against curb and made them larger. It was a better fit for the area, No issues. Contractor and builder also closed 2 existing curb cuts because they led to no where. Vertical curb was installed in the areas. No issues and job is complete. Small housing development |
|
| 08/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Crew from Muira forming curb returns today. Nothing has been poured yet. |