Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/30/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 7/21/17 Precon on site 7/27/17 removals of existing sidewalk, curb and asphalt 8/10/17 forms and grade checked and approved, area was compacted 8/14/17 3 ramps and sidewalk were poured all areas meet standard specks. no issues or repairs needed. |