Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T17RW03065
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2019 | TDOT-EXCAV GENERAL INSPECTION | Approved | Ochoa is complete. per Jack Kokot. No issues | |
| 10/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa still closed waiting on a one way decision | |
| 10/02/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa waiting on thermo striping. | |
| 09/25/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Constuction work complete on Ochoa under PIA, waiting on final stripping | |
| 08/29/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa still closed,No issues. | |
| 08/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa has a new permit to include PCCP from 3 AM to 7 AM. Ochoa should be finished by end of Sept. | |
| 07/22/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa still closed for PIA work, No issues | |
| 04/08/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | No issues, Ochoa still closed for church improvements. permit is for traffic control only. Work on site is PIA | |
| 03/05/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa still closed, no issues, work is proceeding steadily on the church. Jack Kokot has the PIA for the church | |
| 02/26/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa still closed and Church improvements are still going on. | |
| 01/16/2019 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ochoa street closed per plan, remolding of old church | |
| 12/27/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor onsite working - traffic control up per plan - CN | |
| 11/28/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control up per plan - contractor working on PIA stuff - CN | |
| 10/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | checked sidewalk that was poured on the east side of the project - one section was out of spec contractor said that it would be removed when he started the next section - CN | |
| 10/04/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | inspected SG on stone for sidewalk pour - traffic control was setup per plan - CN | |
| 10/02/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out and looked at sidewalk that was poured on stone - traffic control setup per plan - CN | |
| 09/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control setup per plan - CN | |
| 09/06/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet jack over there to introduce him since pia will also be involved, but everyone from diversified was out of the office - CN | |
| 08/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with contractor about utility permits that they would need - CN | |
| 08/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control up per plan - CN | |
| 06/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control set up per plan - CN | |
| 06/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | contractor contacted me and said that he hit a streeet lighting conduit along stone just under the sidewalk - I showed up on site and called the city of tucson electrical department and had brock send someone out to look at it - city electrical cut power to the street lights and then pulled the wire so that the conduit could be repaired - contractor will get back with me with the repair status since about 5 street lights will be out per city electrical - CN | |
| 06/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | had a pre-con about the sidewalk closure on stone in front of the church - checked traffic contol - CN | |
| 05/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control set up per plan -CN | |
| 03/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with foreman and let him know to update his permit - CN | |
| 12/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | traffic control looked good - CN | |
| 11/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - ochoa still closed, traffic control looked good - CN | |
| 11/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | had a meeting with matt about a complaint for this job | |
| 10/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - on going work, traffic control looked good - CN | |
| 09/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | didnt see any issues with traffic control and they are working out of ROW - CN | |
| 08/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | church ocha fully closed off - CN | |
| 08/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - ocha was closed off called blanca to make sure she was aware that they wanted to close it for 18 months - CN | |
| 08/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - ochoa not closed and no work going on in rdway- CN | |
| 08/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Meeting | - had a precon with mario about his pplans to close ochoa for 18moths and i advised him to notify the city and everyone on his permit that he planned to close it for 18months as the permit was only 30 days |
|
| 07/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict sidewalk closed between church and stone on Ochoa. |