Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/30/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
sidewalk panel has been replaced - close permit |
| 10/26/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- Called dana again to see when they would be replacing the side walk he said that he would get on it - CN |
| 09/27/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- still missing sidewalk panel called dana he said that he would get on it - CN |
| 08/24/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
work is completed but an area of side walk needs to be replaced but the permit is expired |
| 07/20/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict contractor has temporary patch sidewalks. |
| 07/17/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict sidewalk temporary patched with asphalt. |
| 07/12/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict sidewalk needs replaced. |