Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | EXPIRED PERMIT NEW PERMIT T18RW00541 |
|
| 01/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT PAVING AT IRVING |
|
| 01/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT PLATES STILL ON 29TH ST NEED TO PAVE AND DO WORK CONCRETE |
|
| 01/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | PAVING AND CONCRETE WORK LEFT. MUST RENEW OR OBTAIN NEW PERMIT | |
| 01/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | CLEANING UP | |
| 12/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCHES NEED TO BE MADE PERMANENT | |
| 12/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 12/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | PLATES STILL ON 29TH AT IRVING | |
| 11/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 11/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 11/14/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 11/02/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 11/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TOLD RICARDO HE NEEDS TO RESET PLATES IN BIKE LANE ON 29TH | |
| 10/31/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/16/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 10/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | PLATES ON 29TH AT SWAN MET WITH PICO ABOUT SIDEWALK REPLACEMENT |
|
| 10/09/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | NPL ASKED ABOUT TRAFFIC CONTROL FOR 29TH AT SWAN, I TOLD HIM TO SBMIT TRAFFIC CONTROL PLAN. WANTS TO WORK THURSDAY | |
| 10/02/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | NPL on site at 31st/Columbus, Ricardo Polido - Foreman, working in the area. Directed NPL to concentrate on compaction. | |
| 09/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 09/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 09/11/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/16/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 08/14/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | NPL CALLED TO LET ME KNOW THAT SOUTHWEST GAS GAVE THEM PERMISSION TO PLACE GAS LINE ABOVE OUR CATCH BASIN | |
| 08/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 07/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |