Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 2"conduit added, 2 driveways repaired on the SW side at Avenida Empalme, alphalt trench across the street looks good. Work complete. |