Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | Work was completed area looks good. | |
| 08/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 7/12/17 underground work started. 7/13/17 Contractor pulling fiber 7/14/17 power was backfilled. contractor finished the job on8/12/17 by setting a new cabinet. No repairs needed, backfill and landscape areas returned to normal |