Permit: T17RW02670

Parcel: 13502001A


Addresses:

1265 S WILMOT RD


Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Permit Number - T17RW02670

Inspection Description - TDOT-EXCAV GENERAL INSPECTION

Inspection Status - Approved

Date Description Inspector Results Comments
08/29/2018 TDOT-EXCAV GENERAL INSPECTION Approved WORK HAS BEEN COMPLETED
NO ISSUES AT THIS TIME
08/28/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection CONTRACTOR NOT ON SITE
08/08/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection CONTRACTOR NOT ON SITE
08/02/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection CONTRACTOR NOT ON SITE
06/14/2018 TDOT-EXCAV GENERAL INSPECTION Continued REMOVED RAMP IN SIDEWALK AT 27TH AND WILMOT. FORMED SUBGRADE IS GOOD
06/12/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection NO ONE ON SITE TODAY
06/08/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection NOT ON SITE
06/05/2018 TDOT-EXCAV GENERAL INSPECTION Continued MEETING, ONE RAMP STILL NEEDS REPLACED. NO WORK ON SITE. MATT CAME TO MEETING ABOUT BROKEN TRACER WIRE.
05/31/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection NOT ON SITE TODAY
05/18/2018 TDOT-EXCAV GENERAL INSPECTION Not ready for Inspection NO ONE ON SITE
04/30/2018 TDOT-EXCAV GENERAL INSPECTION Continued WAITING ON ONE PIECE OF SIDEWALK TO BE COMPLETED
04/26/2018 TDOT-EXCAV GENERAL INSPECTION Continued NOT ON SITE LEE'S ASPHALT HAS COMPLETED ASPHALT ON SIDE STREETS LOOKS GOOD.
04/18/2018 TDOT-EXCAV GENERAL INSPECTION Continued LEE'S PAVING ON SIDE STREETS
04/17/2018 TDOT-EXCAV GENERAL INSPECTION Continued NOT WORKING TODAY
04/05/2018 TDOT-EXCAV GENERAL INSPECTION Continued SUBGRADE GOOD POURING SIDEWALK AND CURB
DOING SOME OF THE ASPHALT REPAIRES THAT ARE NEEDED
04/03/2018 TDOT-EXCAV GENERAL INSPECTION Continued SPENT MOST OF MY DAY HERE. WENT OVER PLACES THAT NEED TO BE COMPLETED BEFORE FINAL. LOTS OF LITTLE PIECES
03/22/2018 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL OK. LEE'S PAVING PAVING CENTER LANE SOUTHBOUND SOUTH OF 29TH
03/20/2018 TDOT-EXCAV GENERAL INSPECTION Continued NORTHBOUND SIDEWALK SUBGRADE GOOD
MEETING WITH TANG
03/14/2018 TDOT-EXCAV GENERAL INSPECTION Continued MET PETE, MATT, BOB G. WENT OVER ASPHALT PATCHES THAT NEEDED REDONE.
03/13/2018 TDOT-EXCAV GENERAL INSPECTION Continued POURING SIDEWALK
03/01/2018 TDOT-EXCAV GENERAL INSPECTION Correction Required HAD TO CALL THEM TO RECOMPACT WHERE ALL SIDEWALK WAS REMOVED.
03/01/2018 TDOT-EXCAV GENERAL INSPECTION Correction Required THEY SHUT DOWN RIGHT LANE ON 22ND SOUTHBOUND. I MADE THEM STOP POURING SIDEWALK PANELS UNTIL TRAFFIC CONTROL WAS SET UP CORRECTLY.
02/23/2018 TDOT-EXCAV GENERAL INSPECTION Continued TOOK OUT CURB AT 24TH AND WILMOT
02/16/2018 TDOT-EXCAV GENERAL INSPECTION Continued TWO GUYS WORKING IN THE RAIN
02/15/2018 TDOT-EXCAV GENERAL INSPECTION Continued CALLED BOB B. TO CHECK ALL STORMWATER STUFF.
02/13/2018 TDOT-EXCAV GENERAL INSPECTION Continued TOLD HIM TO SEND SCHEDULE OF VALVE AND CONCRETE WORK
02/06/2018 TDOT-EXCAV GENERAL INSPECTION Continued MUST MATCH EXISTING ASPHALT
02/01/2018 TDOT-EXCAV GENERAL INSPECTION Correction Required NORTH CORNER AT 24TH AND WILMOT BROKEN CURB
01/31/2018 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL OK
ASKED CONTRACTOR TO PROVIDE DUST CONTROL
01/30/2018 TDOT-EXCAV GENERAL INSPECTION Continued HAD TO WATCH CONTRACTOR EXCAVATE TO FULL DEPTH OF ASPHALT IN TRENCHS BEFORE PAVING
01/25/2018 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL IS OK
01/23/2018 TDOT-EXCAV GENERAL INSPECTION Continued WALKED JOB WITH MATT AND PETE. PAINTED CURB AND SIDEWALK THAT NEEDS REPAIRED. ASPHALT PATCHES WILL NEED WORK BEFORE COMPLETION
01/22/2018 TDOT-EXCAV GENERAL INSPECTION Correction Required COMPLAINTS ABOUT VALVE NEEDING TO BE RAISED.
MET WITH BORDER BARRICADES AND INNOVA HOPEFULLY START 1-24-18
01/18/2018 TDOT-EXCAV GENERAL INSPECTION Continued BROKEN SIDEWALK, CURB, AND BACKSTOPS.
MUST SWEEP AND SWPPP EVERYNITE WHEN LEAVE.
ANY EQUIPMENT LEFT IN ROW AFTER HOURS MUST BE BARRICADED.
ADD SIDEWALK CLOSED AND SIDEWALK CLOSED AHEAD
SIGNS AT EVERY SIDE STREET . SIDEWALKS ARE NOT A PARKING LOT.
01/17/2018 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL IS OK
01/16/2018 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL GOOD
01/05/2018 TDOT-EXCAV GENERAL INSPECTION Continued PAVING
SWEEPING
SHOULD REMOVE TRAFFIC CONTROL SOUTHBOUND AND MOVE TRAFFIC TO CURB AND CENTER LANE NORTHBOUND
12/29/2017 TDOT-EXCAV GENERAL INSPECTION Correction Required WORKING IN FRONT OF ARROWBOARD. I STAYED ON SITE UNTIL TRAFFIC CONTROL WAS FIXED. THEY WILL HAVE TWO LANES OPEN SOUTHBOUND BY NOON ON 12-30-17
12/21/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL GOOD
12/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL GOOD
12/11/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL IS GOOD
12/11/2017 TDOT-EXCAV GENERAL INSPECTION Continued MOVED TRAFFIC CONTROL SOUTH OF 29TH ST MEDIAN AND CENTER LANE NORTH AND SOUTHBOUND
12/07/2017 TDOT-EXCAV GENERAL INSPECTION Continued
12/06/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL GOOD
12/05/2017 TDOT-EXCAV GENERAL INSPECTION Continued
11/29/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL IS GOOD.
ASKED THEM TO OPEN ONE SOUTHBOUND LANE SOUTH OF 29TH
11/16/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL IS GOOD
11/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued
11/13/2017 TDOT-EXCAV GENERAL INSPECTION Continued
11/10/2017 TDOT-EXCAV GENERAL INSPECTION Continued
11/09/2017 TDOT-EXCAV GENERAL INSPECTION Continued
11/08/2017 TDOT-EXCAV GENERAL INSPECTION Continued
11/03/2017 TDOT-EXCAV GENERAL INSPECTION Continued LOWERING PLATES
11/02/2017 TDOT-EXCAV GENERAL INSPECTION Continued TOLD BOB GOMEZ ABOUT DUST
NEEDS TO RECESS PLATES AT 29TH WILL DO IN THE AM
11/01/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/31/2017 TDOT-EXCAV GENERAL INSPECTION Correction Required TOLD INNOVA TO MOVE NORTHBOUND TRAFFIC CONTROL FARTHER SOUTH, REBAG SPPED LIMIT SIGNS,
10/30/2017 TDOT-EXCAV GENERAL INSPECTION Continued MOVE TRAFFIC CONTROL SOUTH IN THE NORTHBOUND LANES
10/27/2017 TDOT-EXCAV GENERAL INSPECTION Continued CALLED ABOUT DUST TALKED TO BOB
TOLD HIM TO REMOVE PLYWOOD FROM ROADWAY TRAFFIC RATED PLATES ONLY IN ROADWAY
10/25/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/23/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/20/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/19/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/18/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/16/2017 TDOT-EXCAV GENERAL INSPECTION Continued MOVED TRAFFIC CONTROL TO CENTER AND HIGH SPEED LANES NORTH AND SOUTHBOUND.
10/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued
10/10/2017 TDOT-EXCAV GENERAL INSPECTION Continued CALLED TO LET ME KNOW THEY ARE GOING TO BE WORKING AT WILMOT AND GOLF LINKS IN THE SOUTHBOUND RIGHT TURN LANE
10/09/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/25/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/22/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/21/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/20/2017 TDOT-EXCAV GENERAL INSPECTION Continued BROKE A PIECE OF SIDEWALK. I PAINTED THE TWO PANELS THAT WILL NEED REPLACED
09/19/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/18/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued MET BOB GOMEZ
09/14/2017 TDOT-EXCAV GENERAL INSPECTION Continued
09/13/2017 TDOT-EXCAV GENERAL INSPECTION Continued THEY OPEN UP SOME OF THE SOUTH END
09/11/2017 TDOT-EXCAV GENERAL INSPECTION Continued COMPLAINTS ABOUT ARROW BOARD IN THE WAY OF THE BILLARDS DRIVEWAY. I HAD BORDER MOVE IT OVER TO THE RIGHT CLOSER TO THE SLOW LANE. I LET BOB AT INNOVA KNOW.
08/29/2017 TDOT-EXCAV GENERAL INSPECTION Continued IN THE INTERSECTION OF 29TH
08/28/2017 TDOT-EXCAV GENERAL INSPECTION Continued BOB CALLED ME ABOUT BUS TURNING RIGHT OFF 29TH. TOLD HIM TO CALL BEA
08/25/2017 TDOT-EXCAV GENERAL INSPECTION Continued PAVING
08/24/2017 TDOT-EXCAV GENERAL INSPECTION Continued
08/23/2017 TDOT-EXCAV GENERAL INSPECTION Continued
08/22/2017 TDOT-EXCAV GENERAL INSPECTION Continued NO SLURRY
08/21/2017 TDOT-EXCAV GENERAL INSPECTION Continued 3 TRUCKS OF SLURRY
08/18/2017 TDOT-EXCAV GENERAL INSPECTION Continued PAVED AS MUCH AS THEY COULD. BARRICADES AROUND OPEN SPACE
08/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued SLURRY LATERALS
TRENCH 4 SLURRY TRUCKS TOTAL
08/16/2017 TDOT-EXCAV GENERAL INSPECTION Continued GOT A COMPLAINT CALL HAD BOB OPEN UP AS MUCH AS HE CAN
08/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued NO SLURRY TODAY
08/14/2017 TDOT-EXCAV GENERAL INSPECTION Continued NO SLURRY TODAY
08/10/2017 TDOT-EXCAV GENERAL INSPECTION Continued PAVED TODAY
08/09/2017 TDOT-EXCAV GENERAL INSPECTION Continued
08/04/2017 TDOT-EXCAV GENERAL INSPECTION Continued
08/03/2017 TDOT-EXCAV GENERAL INSPECTION Continued
08/02/2017 TDOT-EXCAV GENERAL INSPECTION Continued PAVED ABOUT 700 FEET. 1 4INCH LIFT AND 1 2 INCH LIFT
2 TRUCKS OF SLURRY.
TALKED WITH BOB ABOUT TRAFFIC CONTROL CHANGES.
08/01/2017 TDOT-EXCAV GENERAL INSPECTION Continued SUBGRADE GOOD
2 TRUCKS OF SLURRY
07/31/2017 TDOT-EXCAV GENERAL INSPECTION Continued SLURRY AT 1PM
SUBGRADE GOOD
07/28/2017 TDOT-EXCAV GENERAL INSPECTION Continued SLURRY AT 11
07/27/2017 TDOT-EXCAV GENERAL INSPECTION Continued WATCHED THEM COMPACT AND POUR SLURRY
07/26/2017 TDOT-EXCAV GENERAL INSPECTION Continued
07/25/2017 TDOT-EXCAV GENERAL INSPECTION Continued
07/24/2017 TDOT-EXCAV GENERAL INSPECTION Continued COMPLAINT ABOUT TRAFFIC CONTROL AT WILMOT INTERSECTION. WAS SET TO PLAN
07/21/2017 TDOT-EXCAV GENERAL INSPECTION Continued
07/20/2017 TDOT-EXCAV GENERAL INSPECTION Continued
07/19/2017 TDOT-EXCAV GENERAL INSPECTION Continued STILL POT HOLING
07/18/2017 TDOT-EXCAV GENERAL INSPECTION Continued TRAFFIC CONTROL ON SITE
07/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued
07/12/2017 TDOT-EXCAV GENERAL INSPECTION Continued SURVEYORS ON SITE
BLUE STAKING
07/11/2017 TDOT-EXCAV GENERAL INSPECTION Continued PRE CON
MESSAGE BOARDS TODAY