Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T17RW02569
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | paving completed - close permit | |
01/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | asphalt needs to be finished - CN | |
11/30/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | work still not completed, will need to renew permit before completeing work - CN | |
10/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no one onsite job not finished - CN | |
09/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | work still not finished - permit expired | |
09/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - job not finished but permit is expired | |
08/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - showed matt the joints and he said they were fine- cn | |
08/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - picked up the tool from the concrete guys so that i could show matt. i also meet with the tucson water inspector. -cn | |
08/23/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked to the concrete guys about the joints again. I also asked matt to go and look at the joints | |
08/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 1st time talked to concrete guys about ramp being wrong and joints being wrong, 2nd time time talked with carlos about issues | |
08/18/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - double checked the ramp layout with carlos and told him some changes needed to be made he said that he would let the guys know. | |
08/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - talked with carlos and looked at the sidewalk they poured this morning | |
08/14/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - carlos was grading and forming curb. CN | |
08/11/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 18th and osborn - told carlos to use the pag specs not the mag specs that he has on his plans in right away. informed matt | |
08/10/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | meet with carlos and talked about vertical curb for the job | |
07/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - layout was done today for the ramp and sidewalk | |
07/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Meeting | pre con meeting, they will start grade work friday and possibly lay form work monday or tuesday. | |
07/18/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site permit expired stop by contractors office and told him that it's expired. | |
07/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site. | |
07/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site. | |
06/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site. | |
06/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | no work on site. |