Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 06/16/17 Underground done, temporary patch in place 06/20/17 Precon with Chuck (Tucson Asphalt)Asphalt limits set 07/05/17 Saw cut on asphalt complete 7/12/17 Meter boxes installed in concrete. Work complete 07/12/17 Permanent patch complete, no issue, rides smooth |