Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | EXPIRED PERMIT MUST RENEW OR GET A NEW PERMIT HALF OF THE TEMP PATCH COMPLETE. NO HAZARDS AT THIS TIME |
|
| 06/29/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | PERM PATCH COMPLETE | |
| 06/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH | |
| 06/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH | |
| 06/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | MET DANIEL FROM NPL TO SAW CUT FOR ASPHALT REPAIR. ABOUT 400 FOOT LONG. | |
| 06/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |