Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | Tucson water repaired 6 in. Main. a perm patch was completed 5/25/17 11x7. No issues job is complete |