Permit: T17RW01839

Parcel: 125091910

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
07/03/2017 TDOT-EXCAV GENERAL INSPECTION Approved Apron poured back correctly. Final. No Issues.
06/06/2017 TDOT-EXCAV GENERAL INSPECTION Continued Reminded contractor that permit must be renewed before re-pouring driveway apron.
05/24/2017 TDOT-EXCAV GENERAL INSPECTION Correction Required Met with contractor. Sidewalk is in reject status. Slope over 2% due to slight hump in center. Contractor requested meeting with supervisor. Matt Sierras came to check the DW apron. Agreed that correction needed to be made and he informed the contractor.
05/19/2017 TDOT-EXCAV GENERAL INSPECTION Correction Required Apron rejected. Sidewalk slope exceeds 2%
05/17/2017 TDOT-EXCAV GENERAL INSPECTION Continued Pouring Apron Today will return 5/19 for final.
05/15/2017 TDOT-EXCAV GENERAL INSPECTION Continued Discussed how forms need to be adjusted to meet COT and ADA standards.
05/02/2017 TDOT-EXCAV GENERAL INSPECTION Continued Precon for Sidewalk Install. John Wesley Miller Company