Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | NEW PERMIT T17RW03317 | |
| 08/04/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | ||
| 07/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT TEMP PATCHES |
|
| 07/06/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT TEMP PATCHES |
|
| 06/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT TEMP PATCHES EMAILED WATER TO RENEW |
|
| 06/23/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | PERMIT EXPIRED TEMP PATCH |
|
| 05/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH | |
| 05/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |