Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/30/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
All work complete |
| 05/09/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
compaction & form's ok to pour |
| 04/27/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Lot # 45 has been rejected for compaction again for the 4th time so told contractor that he needed a certified compaction test before we go out and check that lot 45 again . |
| 04/26/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Compaction failed |
| 04/21/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Forms ok Compaction failed rejected |
| 04/20/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Cont, called for form inspection Forms ok , compaction failed |