| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | all work completed - close permit | |
| 07/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | closure still up per plan - CN | |
| 07/02/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with mike and asked him to renew his permit - CN | |
| 05/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | still working on the site - traffic control set up per plan - CN | |
| 04/27/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | investigated a complaint about not being able to get into the parking garage - didnt see any issues when i was on site. i also inspected sidewalk that had been poured, also checked traffic control - CN | |
| 04/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | double checked that the traffic control was brought out and setup as the contractor and i talked about yesterday - CN | |
| 04/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went and talked with mike about correcting traffic control and irrigation sleeve - CN | |
| 04/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | checked traffic control - CN | |
| 03/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | called mark martin agaiun to get him to renew his permit and told him that an nov would be written if he didnt - CN | |
| 03/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | called and talked with mark and asked him to renew his permit as it had expired and they are still working - CN | |
| 12/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with david about sewer tie in that they plan on doing the first part of january. I told him to contact me when they are planning on back filling and paving the area. traffic control looked good - CN |
|
| 12/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ped access on broadway set up per plan - CN | |
| 12/13/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no changes in there setup on the broadway side. I also have yet to hear or see anything back from our office on any changes. - CN | |
| 12/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - meet with david about ped issue along broadway. they had built the temp rasied ped bridge and sunlink wasnt happy with it. david also told me that they had a meeting about a week ago with sunlink, contractor and richard at which time they all agreed that they would have the peds walk under all the scafolding along the broadway face. david removed the elavated ped path after that meeting per sunlinks request. I have yet to see any change in traffic control and the office/lance/matt was notified in an email. CN | |
| 11/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | stone sidewalk was closed and other traffic control looks good - CN | |
| 10/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | on going work traffic control looked good - CN | |
| 10/02/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - still working on private property - CN | |
| 09/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - i advised the contractor to admind his tc plan due to the complaints that came in yesterday | |
| 08/31/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | blanca called and said that there was an issue with the jobsite. i went and inspected the job and found nothing and sent blanca pictures. | |
| 08/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | talked with them aboutmodifing there closure permit - CN took a ride with blanca o 10 broadway to look at there setup and she agreed that they didnt have a lot of room and that they needed more but that they still needed to provide access |
|
| 08/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | - blanca called and said they had a crane outside of the closure area. when i showed up the crane was in there closure but they did have a pick/part from another gantry crane that was in the road way. I told them that they needed to keep access to the roadway and that if stuff like this needed to happen again to give me a call. | |
| 07/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict. | |
| 07/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict. | |
| 07/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street still closed. | |
| 07/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street still closed. | |
| 06/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 06/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 06/08/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson closed. | |
| 06/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 05/30/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 05/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 05/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 05/09/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 05/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson Street closed. | |
| 04/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no conflict Jackson St closed. | |
| 04/18/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | 10 East Broadway no work on site |