Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/20/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
talked with dana again and he said that he would get the sidewalk fixed - CN |
| 09/21/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- called dana to have him replace a missing piece of sidewalk - CN |
| 07/18/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
not ready sidewalk needs to be replaced |
| 07/10/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
no work on site sidewalk needs to be replaced Southwest Gas has been informed of it. |
| 06/26/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
sidewalk needs replaced call Southwest Gas for them to renew permit |
| 06/21/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
sidewalk needs to be replaced. |
| 06/16/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict sidewalk needs to be replaced. |
| 06/07/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict Southwest Gas working |
| 05/31/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict working on northbound Lanes of Park. |
| 05/25/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict NPL Crossing Park. |
| 05/22/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no conflict contractors sawcutting Street crossing. |