Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | This was a neat job, kids rebuilt the snake on Pantano and wrightsown. No issues or real specks to follow, barricading was controlled and installed after 9 and removed by 4. Job is complete but will host a ceremony for completetion of project | |
| 04/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Permit was renewed from a 7 day to 1 month | |
| 04/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4/17/17 meeting on site and construction started 4/18/17 blocks were installed for snake 4/19/17 concrete work |