Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 73x32 Perm Patch completed | |
| 05/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Tucson Asphalt preparing very large patch area Schedule to pave 4 in. thick tomarrow |
|
| 04/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Temp Patch at address listed Existing St. has multiple failures in all directions |