Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | Complete. | |
| 05/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Met with Donnie Russel to evaluate sidewalk and broken ramp area on east end | |
| 04/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Sidewalk poured and checked OK for cross slope and finish East end does not match existing ramp grade at broken section. Will evaluate after ramp repair required that discovered during form inspection and relayed to Donnie Russel to inform Pulte Rep. |
|
| 04/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Forms and subgrade approved Broken corner section on adjaceint ramp east end needs repair |