Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/18/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
new sidewalk areas were poured and verified today, all new sidewalk meets ADA requirements. No issues complete |
| 05/11/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Checked forms for revised areas to driveway and sidewalk. Because of uneven TOC elevations, cross slope varies between 1.5% & 2.3%. Contractor advised to have reinspection before pour to assure that expansion joint placement suffices to remedy the problem. |
| 05/05/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Met with David Stiffey, Matt Sieeras and Tom Adkins on site. sidewalks are at 3 percent cross slope. contractor will be notified |
| 04/18/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Oremus supplied 8 cyds of material for todays pour, no issues, score joints and expantion in areas that we discussed. |
| 04/11/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Met with owner and contractor. Forms up for sidewalk and driveways but not ready to pour. Curb modification is needed for ADA compliance. |