Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 04/25/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Verified completion date unknown. |
| 11/09/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Lot 27; 4 panels of sidewalk replaced (2 exceeded cross-slope and 2 were cracked). All 4 replacement panels are accepted. Lot 26; sidewalk and driveway apron poured this past Monday. All meet the standards for cross-slope and other specs. All accepted. Contractor still needs to repair small chips in the curb. |
| 11/01/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Lot 26; form inspection for driveway apron and sidewalk in front of this lot, forms acceptable, grade acceptable. Per Don with Segunda, they will be pouring this sidewalk and driveway on Monday 11/6. |
| 04/05/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
all inspection done by P.I.A inspector Donnie Russell. |