Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 5/1/17 K E and G backfill and patched asphalt around new manhole 5/2/17 adjusted manhole in concrete 5/5/17 all barricades removed, are can use a good sweeping, but no issues |
|
| 04/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4/27/17 Excavated cleanout and installed shoring box 4/28/17 K and G set precast manhole and stacked a barrell and one flat top. Mike roberts from Pima county on site to check sewer work Area started to be backfilled but will not finish Road is closed to traffic due to open trench |