Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T17RW01226
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | work is complete except fpr a small patch in Eastbound bike lane, area needsto be repaved along with the entrance to the new building | |
04/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 4/7/17 precon on site for upcoming work Paul 520-471-4379 4/14/17 started excavating and installed 8 in P.V.C into manhole. Pima county checked the water stop and pipe installation 4/18/17 area was backfilled and oked |
|
04/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | work complete, needs small asphalt patch, can be complete with lot paving |