Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/14/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
No Issues |
| 03/06/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Area still requiring backfill completion and sidewalk replaced |
| 03/06/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Met contractor on-site, inspected and approved trench backfill. Contractor will pour concrete on 3/7 or 3/8. |
| 03/03/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Contractor called for a backfill inspection. Contractor was compacting with a hand tamp. Ordered contractor to remove backfill and compact trench with the proper equipment. |