Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | Tricon started on excavation on 3/6/17, area was fenced off and roadway was closed Tricon began testing the line on 3/10/17, area of pipe was determined to need to be replaced. The existing line did break again further down Glenn. New permit was issued for that repair. Tricon replaced the reclaimed line and backfilled area with A.B.C material. Tucson asphalt paved on 3/23/17. Tucson water had issues with the paving area that I set, after Discussing it with Mike Ross and Gabe Hernadez they were ok with the paving limits. Manhole and valves were adjusted. No issues with area. |