Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T17RW00864
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | EVERYTHING IS GOOD AS FAR AS I CAN TELL | |
05/19/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
05/16/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | NORTHSIDE CURB AND RAMP GOOD | |
05/09/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | POURING CURB AND SIDEWALK | |
05/08/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NOT WORKING | |
05/02/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ramp and sidewalk poured yesterday Met onsite with TDOT lead Pete C. to approve Some work remains on new vert curb damaged today. |
|
04/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Paving from yesterday looks OK Ramp and sidewalk were not poured this morning per schedule Rescheduled for Mon. |
|
04/27/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Magnum paving N/side of entrance again after grade issues were resolved | |
04/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Recheck ramp and sidewalk grade after repairs Approve to pour |
|
04/25/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Ramp area subgrade rejected Material only wet on top layer Dry and Soft 6 in. below grade |
|
04/24/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Check curb forms on N/Side of driveway entrance and approved to pour | |
04/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | TOOK OUT CURB AND SOME ASPHALT. FORMED NEW CURB CHECKED SUBGRADE OK. |
|
04/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Entry way paved against new curb. Drainage issues possible at new gutterline and being evaluated by contractor |
|
04/12/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Working on N/side of entry way on Rita Rd | |
04/10/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Entry curb poured N/Side | |
04/10/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | N/Side of entry way curb poured | |
04/07/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | 2 visits today for contractor to acheive subgrade density and depth requirements. Approved to pour | |
03/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
03/22/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
03/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | No ROW work at this time | |
02/28/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | No removals at this time |