Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | irrigation repair was completed on 3/8/17. Temp patch was put in place 3/28/27 perm patch in place on the frontage road. No issues |
|
| 03/01/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | Met with contractor and HOA rep. Work to proceed Tuesday 3/7. |