| 07/05/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | 6/7/17 potholing on site 6/8/17 Tricon trenching to expose pipe 6/9/17 area barricaded and secured 6/24/17 valves were replaced on saturday. Tucson water got a real nice shutdown. No issues backfilled the week of the 6/26. No issues Ramp was complete when i was on vacation. No issues and all concrete was replaced to the lomits i set. Job is FINALLY complete |
|
| 05/11/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | no work, conflict with Tucson water and the repair work | |
| 03/20/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | No work. Permit has expired |