Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | Concrete poured 2/14/17 no issues. Grade, forms and overall area checked. roughly 15 ft of wedge curb removed due to damage. No issues |