Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | Traffic control set up correctly. Tucson water repaired hydrant from within stem pipe. No repairs needed. One day project |