Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 03/17/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final Inspection. Approved and Final. |
| 03/06/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pouring 2 remaining entrances today. |
| 02/20/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Visit to discuss removals of existing asphalt DW apron to be replaced with Concrete DW apron. |
| 02/17/2017 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Additional 14lf of curb must be removed and replaced in order to maintain 6" reveal on curb around curb return. In addition an extra 4 panels of 5x5 sidewalk must be removed in order maintain acceptable alignment of ADA ramps and adjoining sidewalk. |