Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/29/2017 | TDOT-EXCAV GENERAL INSPECTION | Approved | new permit was issued T17RW01382 | |
| 03/21/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | PERMIT EXPIRED temp patch in sidewalk EMAILED SOUTHWEST GAS TO RENEW AND PATCH |
|
| 03/15/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | Pavement Perm patch installed Temp patch in side walk Permit remains expired |
|
| 03/09/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | PERMIT EXPIRED TEMP PATCH |
|
| 02/17/2017 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | Permit Exp. Spoke with onsite Supt. to renew permit Temp Patch |
|
| 02/03/2017 | TDOT-EXCAV GENERAL INSPECTION | Continued | ||
| 01/26/2017 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NO ISSUES |