Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2018 | PLUMBING - FINAL | Approved | ||
| 09/25/2017 | PLUMBING - FINAL | Not ready for Inspection | OK FOR SHEET ROCK. RECALL FOR FINAL AFTER FIXTURES ARE INSTALLED. | |
| 09/22/2017 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/15/2017 | PLUMBING - FINAL | Denied | 1- SHALL SECURE THE PEX WATER LINES EVERY 32 INCHES HORIZONTALLY AND 4 FEET VERTICAL. 2- SHALL PROVIDE THE REQUIRED SAFTEY NAIL PLATES FOR ALL TOP PLATE PENETRAIONS AND ALSO A STANDARD NAIL PLATE AT KITCHEN 3/4" COPPER WATER SUPPLY. |