Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2017 | PLUMBING - FINAL | Approved | ||
| 04/20/2017 | PLUMBING - FINAL | Not ready for Inspection | pressure test failed, 1/2 pound loss in 15 min. | |
| 04/18/2017 | PLUMBING - FINAL | Denied | 1- no press test 2- wrong press gage 3- protect all tool matks 4- coated pipe required to 6" above grade 5- top of pipe to be minimum 12" depth |