Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: SIGN ELECTRIC
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2017 | SIGN ELECTRIC | Not ready for Inspection | COMPLET TIE IN FOR SIGN ON SOUTH EAST WALL BEFORE FINAL. |