Inspection History Details
Inspection Status: Approved
Inspection History: SIGN EXCAVATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2017 | SIGN EXCAVATION | Approved | ||
| 08/11/2017 | SIGN EXCAVATION | Continued | 1) SIGN CONRACTOR ADVISES GENERAL CONTRACTOR TO SET J-BOLTS AND POUR CONCRETE FOR TWO SEPARATE MENU BOARD FOOTERS DURING SITE WORK. 2) IN LIEU OF FOOTER INSPECTION BY STAFF, OK FOR GENERAL CONTRACTOR TO EMAIL STAFF PDF ON LETTERHEAD STATING FOOTERS INSTALLED TO PLANS. |