Permit: T17OT00463

Parcel: 13213058A


Addresses:

1111 E BENSON HY

Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Date Description Inspector Results Comments
10/27/2022 COT - ENGR - Signage Final Not Ready
02/15/2019 COT - ENGR - Signage Final Passed {Activity date: 02/15/2019; Status: Approved; Inspector: Hthrall; Comment: Entered by HTHRALL1 - RE: sign permit status - partial approval for release
For: freeway sign
AT: 1111 E Benson Hwy (Vanguard Truck Center - Mack/Volvo)
Sign Permit: T17OT00463
Reviewer: H. Thrall / E. Newcomb
Date: 2/15/19
Master Sign Program approved: MSP18-022 / T18SA00375


1) Revised Special Inspection Certs approved.} ; {Activity date: 02/01/2019; Status: Partial Approval; Inspector: Hthrall; Comment: Entered by HTHRALL1 - RE: sign permit status - partial approval for release
For: freeway sign
AT: 1111 E Benson Hwy (Vanguard Truck Center - Mack/Volvo)
Sign Permit: T17OT00463
Master Sign Program approved: MSP18-022 / T18SA00375

1) Updated engineered diagrams and calcs approved.

2) Provide revised special inspection form, sealed by engineer, appointing specific qualified special inspector for required special inspections. (New form link and links to lists of inspectors/companies sent to James Goins of Allen Industries and Sign Magic via email.)

3) Send revised form to Heather.Thrall@tucsonaz.gov for evaluation.
} ; {Activity date: 01/23/2019; Status: Continued; Inspector: Hthrall; Comment: Entered by HTHRALL1 - Engineering resubmitted by James Goins of Allen Industries (via emailed PDF) on behalf of Sign Magic.} ; {Activity date: 10/25/2018; Status: Continued; Inspector: hthrall1; Comment: Entered by HTHRALL1 - Heather spoke with Engineer, Jim Hogan, in Chicago - and emailed set of drawings that included engineering and calcs with addendum sheets for his examiniation. Jim will be revising engineering sheet and calcs. Discussed which addendum pages of the sign package will remain and which would be removed. Discussed plate sizes, names of plate references on the engineering plan and that the Volvo sheet is to be re-sent to him from Allen Industries for his seal. He will seal one of the other Mack sheets for the sign. Indicated he has special inspection form and the sign will need high strength bolt and concrete inspection at minimum. Heather sent email of all authorized special inspectors / companies in area, and copied contractor, Sign Magic to assist with selection.} ; {Activity date: 10/18/2018; Status: Correction Required; Inspector: hthrall1; Comment: Entered by HTHRALL1 - RE: Review of Engineering (E. Newcomb / H.Thrall)
For: Freeway sign
AT: 1111 E Benson Hy
Date: 10/18/18
Permit: T17OT00463 / submitted again under Sign Standards (kept 2017 permit number for reference of all documents/ process

Master Sign Program case MSP-18-022 /T18SA00375 was approved (for a Singular Sign Design Option to increase freeway sign area to 351 square feet from 112 square feet (based off lot line length of just 28' along I-10).
Permit can be released after 10/9/18 per Director's Notice of Decision, with following corrections to Engineering calculations and drawings:

1) All engineering sheets to be re-stamped by engineer, as seal expired.

2) Engineering data is on an unstamped sheet for Volvo portion of sign production - have engineer seal and check all dimensions to match engineer's drawing.

3) Calculations need to be VERSION CHECKED & restamped - cross check with engineering drawings that shows a solid sign cabinetry construction from top to bottom - this drawing has the ribbon reveal support located between top/bottom faces. The calculations are from a prior iteration without a solid cabinetry construction, but an opening that is no longer applicable in the center of the cabinetry. Calculations need to be updated.

4) Spool (cylinder length and diameter between support plates) length appears incorrect - longer in spec sheet - and older iteration given the spacing is not the same between the sign cabinetry design as prior iterations.
The length is not dimensioned on spec sheets, please add. Ensure engineer seals and matches to support plate specs on engineering diagram as is on spec sheet for spools/plates.

5) Engineering diagram sheet - label and use arrows to clearly ID which support plate applies to the mount on the drawing - the drawing titles are not clear as to which plate goes where on the sign cabinetry supports.

6) Engineer to fill out the special inspection form here, select type of special inspection(s) and qualified inspector(s) noted from the list maintained by the Town of Oro Valley. Special inspection form to be approved first by E. Newcomb prior to any permit release.
Form: https://www.tucsonaz.gov/files/pdsd/forms/Special_inspection_certificate.pdf

7) Further review comments may be forthcoming. Please email revised engineering calculations, spec sheets and engineering sheets to Heather.Thrall@tucsonaz.gov} ; {Activity date: 10/09/2018; Status: Continued; Inspector: hthrall1; Comment: Entered by HTHRALL1 - No appeal filed to approval of SSDO (case MSP-18-022 / T18SA00375). Review of engineering for the plans to now take place. (Waited to be reviewed until status of SSDO known.)} ; {Activity date: 09/24/2018; Status: Continued; Inspector: hthrall1; Comment: Entered by HTHRALL1 - Director's Notice of Decision was issued to approve request to increase sign area allowance off I-10 lot line to in turn allow a 351 square foot freeway sign (instead of 28' lot line x 4 at limit of 112 sqft.). Appeal period ends 10/9/18 under case T18SA00375. (All notes under T18SA00375)} ; {Activity date: 09/21/2018; Status: Continued; Inspector: hthrall1; Comment: Entered by HTHRALL1 - Design Professional's review completed for SSDO.} ; {Activity date: 08/29/2018; Status: Continued; Inspector: hthrall1; Comment: Entered by HTHRALL1 - Referred proposal to Sign Design Review Committee process via design professional until committee seated.} ; {Activity date: 08/24/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - emailed contractor for update to sealed engineering stamp (should SSDO process be approved) and to provide site plan with freeway sign orientation now to I-10 rather rather than perpendicular to I-10. Addendums to SSDO submittals.} ; {Activity date: 08/17/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Singular sign design option application received} ; {Activity date: 07/06/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Drawings received for OLC compliance notations.} ; {Activity date: 07/03/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Discussion with sign contracting team about taking freeway sign request forward through the new sign varying process (Master Sign Program) as a Singular Sign Design Option. The request is to increase sign area allowance off I-10 property line frontage to allow a nearly full sized freeway sign, rather than maintain a 110 square foot freeway sign. The proposed freeway sign would meet all freeway sign design criteria.} ; {Activity date: 01/18/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Emailed contractor reminder to check his diagram against engineer's revised diagram while waiting for engineer's calculation sheets.} ; {Activity date: 01/16/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Emailed contractor staff noted the changes in the drawing, but the engineer's sealed calculations sheets are needed for the full review.} ; {Activity date: 01/15/2018; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Contractor emailed new drawing. Height reduced to 48 foot as measured from base. Noted connections shown. Reviewed with Eric.} ; {Activity date: 11/30/2017; Status: Continued; Inspector: hthrall; Comment: Entered by HTHRALL1 - Emailed Mike from Sign Magic, to meet 12/4/17 to discuss
09/13/2019 COT - ENGR - Signage Final BBENEDON Partial Approval Entered by DMERANZ1 - OK to approve permit with receipt and acceptance of special inspectors reports.