Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
Permit Number - T17FC00507
Inspection Description - FIRE SPKLR - OH PIPING & HYDRO
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2018 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 11/17/2017 | FIRE SPKLR - OH PIPING & HYDRO | Approved | All areas were completed. Need to add two heads in the NW room bedroom and living room | |
| 11/09/2017 | FIRE SPKLR - OH PIPING & HYDRO | Denied | NOT READY. Not pumped up. 1410hrs. Reinspection fee added. Must be paid prior to next inspection. | |
| 10/31/2017 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Bldg A 3rd Floor Overhead/Hydro ONLY Approved | |
| 10/26/2017 | FIRE SPKLR - OH PIPING & HYDRO | Denied | NOT READY | |
| 10/25/2017 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Approved the parking garage underground hydro ONLY. Water is not connected to perform a flush. | |
| 10/20/2017 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | The following per inspector JPD: 1) UG parking not approved. need to place correct tracer wire. Reinspection fee added. 2) BLDG 1, area 2, second floor, approved. OH/Hydro. |
|
| 10/17/2017 | FIRE SPKLR - OH PIPING & HYDRO | Denied | Called to the parking structure for underground Hydro. NOT READY> Needs 200 psi for minimum of 2 hours, tracer wire needs to be installed, thrust block to be poured prior to arrival. | |
| 10/13/2017 | FIRE SPKLR - OH PIPING & HYDRO | Partial Approval | Phase 1 west side 1st floor FP2. Also charging for 4 more inspections to be paid in full prior to next partial. |