Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2017 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | ||
| 01/05/2017 | FIRE SPKLR - UG, PIPING, HYDRO | Denied | Contractor NOT ready. Drawings clearly state 2 hour pressure test. Pressured 20-30 minutes prior to arrival. Also, all connections were wrapped. Advised that they need to unwrap all connections for proper inspection. ---- SIDE NOT TO INSPECTORS: HARD HAT REQUIRED ON SITE!!!!! |