| 11/01/2017 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
The owner has called Steve Sheilds the supervisor from zoning and explained what the plan that was approved was for shows the amount of asphalt that was approved. Steve did talk to Russlyn Well the zoning administrator and the pavement that is on the property in the front of the building is the same amount that was approved on the plan. At this time the case will be in compliance and will not have to do anything else at this time. Will make contact with the owner next door to let him know the results. Violation Abated, Close Case. RV. |
| 10/04/2017 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Met with Mike at the office and served the N.O.V. He would not sign the paperwork and gave a copy of the N.O.V. to send to the main office in Phoenix. I did receive a call from the Phoenix office and they will be calling Planning and Development Services Department to check if they have different option to cover the parking lot for the dust control. Will check in 30 days. RV. |
| 10/03/2017 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Met with the Building Offical and the Zoning Offical and went over the issue of the rock and gravel being used instead of the asphalt that was approved on the site plan. The rock and gravel is not going to be allowed and has to use the asphalt or the 2-coat chip seal as the approved methods to cover the parking lot area. Will do the N.O.V. and will call the manager and the person in Phoenix office to let them know. RV. |