Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T17DV03157

Parcel: 11623102Y


Addresses:

942 W 21ST ST

Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Date Description Inspector Results Comments
07/24/2017 INSP - INITIAL CODE ENFORCMENT Approved VISITED SITE, MET WITH OWNERS WIFE VERONICA ROJO WHO STATED HUSBAND WAS NOT HOME AT THE TIME BUT TOOK ME TO WHERE THE WALL WAS TO BE GOING UP. ON THE EAST SIDE OF THE STRUCTURE FROM THE STREET TO THE BACK OF THE PROPERTY APPROX 175 LF AND ALONG THE BACK OF THE PROPERTY A TRENCH APPROX 50-75 LF OF TRENCH. DIRT FROM THE TRENCHES WAS PLACED IN FRONT OF THE TRENCH TO ACT AS BERM TO STOP ANY WATER. I EXPLAINED TO HUSBAND ABRAHAM THE PROBLEM WITH THE WATER DUMPING INTO NEIGHBORING PROPERTY. ABRAHAM EXPLAINED THAT THE PROPERTIES ACROSS THE STREET ARE HIGHER THAN HIS AND DUMP WATER ONTO HIS PROPERTY AND PROPERTIES ACROSS THE STREET(ABRAHAM'S PROPERTY) THAT ARE 6 FT HIGHER THAN THE PROPERTY IN QUESTION ALL SLOPE TO THE NORTH AND CONTRIBUTE TO THE AMOUNT OF WATER THAT DUMP ONTO THE PROPERTY.
OWNER ABRAHAM ROJO STATED HE WOULD PLACE SANDBAGS IN THE TRENCH EVERY 20 FT TO SEE IF THAT WOULD HELP. SPOKE TO RICK SALDATE EXPLAINED THE BAGS MAY BE BETTER THAN THE SLIP CONTROL HE WAS THINKING OF, BUT WATER FROM THE 3 LOTS TO THE EAST WILL CONTINUE TO DUMP WATER ONTO 935 W OCHOA LN