Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2017 | INSP - INITIAL CODE ENFORCMENT | Approved | Arrived on site and no one present at this time. *Found Meter socket with one phase burned on the secondary side of the meter. *Owners arrived and explained that TEP pulled and took the meter with them. *Inspector Valdez Arrived to assist. *After gaining access we found numorous minor safety violations. After assessing the situation we determined temp power to the walk-in box and the frezzer only could be used through small generators. A Licensed Electrical Contractor would be needed. *A Licensed Electrical Contractor arrived on site and was showed and explained what would need to be done for temp power and for the permit. Load calculations and floor plans will be needed for the service upgrade. The EC will take care of the unsafe conditions inside of the structure. *Inspector Valdez issued an onsite NOV for Electrical and Emergency Abatement. Follow-up with full NOV next week. *Spoke with the owner brief discription of what would need to be done for permits and temp power. *Owner explained no public allowed in the structure. |