| 12/05/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Received email from building inspector: He has a licensed electrician doing the electrical work, I think they did change the WH to electric, and they are installing a Mini-Split heat pump. As far as I can see, it is all covered under their existing permit. Bruce Stevens Building Inspection Supervisor City of Tucson PDSD Close Case. |
|
| 08/02/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | See Conditions | |
| 08/02/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with Glenn the maintenance man to go over the project.They misunderstud that we were done with the drywall issues and they removed the drywall from the demising/party wall. They have now uncoved more electrical violations. It was explanied what needed licensed contractors to do the work. He stated that they wanted to remove the wall furnance and replace with a heatpump on the roof. That will need a permit. They want to change the water heater to an electric one and that will need a permit. | |
| 05/11/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with inspector Vidal and determined the drywal is marginaly acceptable. He needs to finish after electrical inspections. Discovered the water heater is in a hazardous condition. No T&P piping and coroded. Inspector Vidal agreed with the determination for the wall heater and electric. Owner showed up as I was leaving see conditions. | |
| 05/11/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Assisted on the inspection on checking the workmanship of the drywall. Met with the tenant. RV. | |
| 05/10/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the tenant and viewed the work done to the interior. Patch work was done, but not to standards. Electrical work was done by his maintance man and not to standards. No permit obtained as of this time. Tenant had a mechancial contractor come to repair the cooler and wall heater and the invoice states different than what the owner says. Need assisantence to determine wall and ceiling repairs. | |
| 04/26/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owner and looked at the door that was installed on the north side of the unit. The pre-hung door has been removed and the framing was able to be looked at and was pre-existing opening and just remove the old door and placed the new pre-hung in the opening. The trimmers may have been replaced with new but the header was the existing. The door will be replaced and no permit is required at this time. The wall furnace has been repaird and was serviced by a contractor and the owner will get the billing and make a copy to give to the inspector for the file for records. The cooler has been repaired and the tenant was not on site to check if operable. The tenant will be called to check if operable. The electrical has issues and will require a permit to have the correction inspected by Planning and Development Services Department. There are issues with the tenant and the landlord and the owner will need addtional time to make the correction on the interior of the unit. RV. | |
| 04/26/2017 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owner and inspector Vidal. It was determined that a permit for the door was not needed. The gas was repaired by a tradesman and he is tryibg to get us paperwork for that. The electrical needs a permit. He was shown what was done and the concerns for that workmanship. He stated the the drywall repairs have been done as well as the cooler repairs. We did not get interior access to check. He stated that the smoke detectors had been replaced. I will contact the tenant for interior access. |