Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 08/07/2018 |
ENGINEERING - FINAL |
|
Approved |
|
| 06/07/2018 |
ENGINEERING - FINAL |
|
Denied |
THIS INSPECTION WAS CALLED IN FOR THE USE OF A SITE VISIT TO DETERMINE WHAT ITEMS WILL BE NEEDED PRIOR TO OBTAINING THE TCO IN 2 MONTHS. DUE TO THE EXTENT OF THE WORK BEING DONE AT THIS TIME A LIST OF ITEMS WILL NET BE ABLE TO BE GENERATED, THE CONTRACTOR HAS BEEN ADVISED TO RECALL THIS INSPECTION IN 4 TO 6 WEEKS OUT WHEN THEY ARE ABOUT A MONTH FROM SEEKING A TCO. AT THAT TIME I WILL WALK THE SITE AND CREATE AN EXTENSIVE LIST OF ITEMS THAT ARE INCOMPLETE AT THAT TIME. |