Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/15/2018 | ELECTRIC - FINAL | Not ready for Inspection | cancelled | |
| 03/15/2018 | ELECTRIC - FINAL | Approved | ||
| 03/13/2018 | ELECTRIC - FINAL | Partial Approval | rooms 1,2,3 2 front offices and restrroms ok | |
| 03/08/2018 | ELECTRIC - FINAL | Not ready for Inspection | no work | |
| 03/07/2018 | ELECTRIC - FINAL | Not ready for Inspection | CLEAR UPO ALL OPEN INSPECTIONS PRIOR | |
| 03/02/2018 | ELECTRIC - FINAL | Partial Approval | SITE NOT COMPLETE AT THIS TIME PROVIDE THE FOLLOWING: 1) PROVIDE THE APPROVED REVISED DRAWINGS THAT REFLECT THE CHANGE OF MATERIAL FOR THE SIDEWALKS FROM CONCRETE TO ASPHALT. 2) MAKE THE NECESSARY REPAIRS WITH THE CROSS SLOPES IN THE AREAS FOR CHANGE OF DIRECTION WHERE IT EXCEEDS THE MAXIMUM 2%. |