Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
01/26/2018 FRAMING Approved IVRS - Inspection :*
01/23/2018 FRAMING Denied IVRS - Inspection :
See detailed listing on site.| 999
1- DWV WATER TEST FOR THE SECOND FLOOR RESTROOMS PROVIDED.
2- P.O.C. OF THE NEW BLDG. DRAIN TO THE EXISTING BLDG. DRAIN IS OKAY.
3- OVERHEAD AND IN WALL DOMESTIC WATER DISTRIBUTION FOR THE SECOND FLOOR RESTROOMS IS OKAY.
4- SHALL PROVIDE THE APPROVED SCREWS FOR THE METAL STUDS.
5- SHALL PROVIDE KICKERS EVERY 4 FEET ON PARTION WALLS.


*
12/28/2017 FRAMING Partial Approval 110 OK