Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
| Date |
Description |
Inspector |
Results |
Comments |
| 07/12/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Approved |
WALLS TOPPED OUT AT TIME OF MY INSPECTION |
| 07/03/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
WEST WALL AND MOST OF SOUTH WALL OK. IF VERTICALS ARE NOT PENETRATING BOND BEAM ADD BARS NEXT TO THEM. EAST SIDE NOT COMPLETED AT TIME OF INSPECTION. TOLD CONTRACTOR TO TAKE PHOTOS OF THAT SECTION, OTHERWISE OK TO POUR 5TH LIFT. |
| 06/28/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
IVRS - Inspection :* |
| 06/26/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
OK TO POUR 3RD LIFT |
| 06/22/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
NORTH SOUTH AND EAST 12 COURSES 2 LIFTS WITH #5 PER PLAN |
| 06/21/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
@ 60' WEST SIDE 13 COURSES |
| 06/19/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
6 COURSES WITH 2 #5 BARS FOR BOND BEAM |
| 06/14/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Denied |
NO BOND BEAM INSTALLED |
| 05/04/2018 |
REINFORCED MASONRY PRE-GROUT |
|
Partial Approval |
OK TO POUR STEM WALL/ FIRST 3 COURSES |