Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
| Date |
Description |
Inspector |
Results |
Comments |
| 06/14/2018 |
BUILDING PRE-SLAB |
|
Approved |
|
| 05/31/2018 |
BUILDING PRE-SLAB |
|
Partial Approval |
APPROVAL IS FOR SLAB SECTION ONLY, NOT FOR DRAIN SECTION AT ENTRANCE. ALSO SEVERAL PLUMBING PIPES STILL NEEDED TO BE WRAPPED AT TIME OF INSPECTION. |
| 05/23/2018 |
BUILDING PRE-SLAB |
|
Partial Approval |
Approved only the 3 Thickend Areas of the Slab area for Concrete |